KontrollVahend ja Tehnika (KVT) OÜ
Exclusive representative
Hottinger Baldwin Messtechnik GmbH, Germany
+372 6006190
+372 6006680


Assembly production



Defects

06-01_monitoring-sborki_400x300.jpg

The connection of the two elements by pressing is a common practice. The quality control of components produced without the use of destructive testing, during Assembly process provides for simultaneous measurement efforts pressing and moving.

HBM has many years of experience with Assembly processes. This knowledge is embodied in the control and measuring equipment, which, in combination with standard industrial interfaces allows performance of all necessary tests.



Assembly production:

  • Riveting components and sheet metal
  • Press and countersunk riveting
  • Press fit bearings in gearboxes
  • The Assembly of the valve seat and krysok cylinder head
  • Multicomponent monitoring efforts in the Assembly process of aircraft structural elements



Назад в раздел